RUDAWIraq reports adequate water reserves, revival of southern marshes5HIRAQI NEWSIraqi Drilling Company completes well rehabilitation at West Qurna 1 oil field5HIRAQI NEWSIraqi Prime Minister orders higher military readiness as security tensions rise5HIRAQI NEWSIraq’s State Administration Coalition warns armed groups after September 306HIRAQI NEWSIraq wins legal case in Jordan for Samarra Pharmaceutical Company6HRUDAWBaghdad requested Syrian border buildup, no proof of attacks from Iraqi soil on Saudis: Spox6HRUDAWEfforts to fill Iraq's remaining cabinet posts to gain pace next week7HKURDISTAN24Anbar Authorities Dismantle Drug Network, Seize 408,000 Captagon Pills8HIRAQI NEWSIraq’s electricity shortage surpasses 35,000 megawatts8HIRAQI NEWSIraq’s oil exports slightly rise during July10HKURDISTAN24Iraqi Politician Mithal al-Alusi Urges Saudi Investment Ahead of Baghdad Delegation Visit10H964 MEDIAIraq currency exchange rates – August 6, 202610HIRAQI NEWSUS lifts sanctions on Iraq’s Fly Baghdad11HTHE NEW REGIONIraqi parliament moves to address worsening financial deficit11HRUDAWUS delists Iraqi airline after more than two-year ban over IRGC links12HTHE NEW REGIONIraqi ruling coalition affirms adherence to armed groups disarmament deadline14H
Iraq Monitorعين على العراقPrimary-source intelligence
Annex · annex pages 1–80

The 38 annexed tables

The systematic record, entity by entity: who ignored the auditor, who never filed accounts, who exceeded the legal deficit cap, who kept staff pension money.

Tables in this chapter38
Verified and live20
Figures published434

Every table in this chapter

In printed order, as the Board set them out. A table with a link has been transcribed twice, reconciled and published — open it to read the figures. The rest are named with their page so you can see exactly what is still to come.

TABLE 1
Reports the auditor never got an answer toجدول رقم (١) التقارير التي لم ترد الإجابة عليها لغاية ٢٠٢٦/٣/٦Bodies that simply did not reply to the Board, to 6 March 2026.
~40 rowsnot yet extracted
TABLE 2
Refusing or delaying a reply to the Boardجدول رقم (٢) الامتناع او التأخير بالرد على مذكرات وتقارير الديوان واستفساراتهBodies that stalled on the Board’s memoranda and reports.
~10 rowsnot yet extracted
TABLE 3
Companies past the legal deficit capجدول رقم (٣) تجاوز العجز المتراكم النسبة المسموح بها قانوناً لرأس المالState and mixed companies whose losses exceed the share of capital the law allows.
7 rowsverified
TABLE 4
Bodies that never filed their accountsجدول رقم (٤) الإدارات التي لم تقدم بياناتها المالية لغاية ٣١/١٢/ ٢٠٢٥Administrations with no financial statements filed to 31 December 2025.
~5 rowsnot yet extracted
TABLE 5
Allocations unused, or exceededجدول رقم (٥) عدم استغلال التخصيصات السنوية كلا أو جزءا منها أو التجاوز عليهاAnnual allocations left unspent or spent past.
33 rowsverified
TABLE 6
Ministry headquarters taking their units’ moneyاستغلال مراكز الوزارات التخصيصات المعتمدة للدوائر والتشكيلات التابعة لهاCentres using allocations meant for the bodies beneath them.
9 rowsverified
TABLE 7
Ignoring cabinet decision 361 of 2022عدم الالتزام بقرار مجلس الوزراء رقم (٣٦١) لسنة/٢٠٢٢ المتضمن الاستثناء من تعليمات تنفيذ العقود الحكوميةBodies not applying the exemption rule.
12 rowsverified
TABLE 8
Contracts signed with no feasibility studyعدم تقديم دراسة جدوى اقتصادية لمعظم المشاريع المتعاقد على تنفيذهاMost contracted projects had no economic case.
~12 rowsnot yet extracted
TABLE 9
Estimated costs neither accurate nor updatedعدم دقـة وتحديث الكلف التخمينية للعقودContract cost estimates left stale.
25 rowsverified
TABLE 10
No certificates of originعدم تقديم شهادات المنشأ لكافة البضائع والتعاقدات الحكوميةGovernment purchases without origin documentation.
11 rowsverified
TABLE 11
Winning bidders left waiting to signتأخر المناقصين الفائزين بالاحالة (المبلغين بصدور أمر الإحالة) عن توقيع العقود ضمن المدة البالغة…Awards not signed within the 14 days the rules allow.
62 rowsverified
TABLE 12
Contractors with no comparable workعدم قيام بعض الشركات المتعاقد معها بتقديم أعمال مماثلةCompanies awarded work without proving they had done similar.
23 rowsverified
TABLE 13
Guarantee letters that expire too earlyقبول خطابات ضمان لا تغطي فترة تنفيذ وصيانة المشروع واستكمال التعاقد قبل التأكد من صحة صدور خطاب الضمانGuarantees not covering execution and maintenance.
verified
TABLE 14
Contracts barely progressingتدني نسب الانجــاز التعاقدي لبعض العقودVery low completion rates on signed contracts.
50 rowsverified
TABLE 15
The blacklist never checkedعدم قيام بعض الجهات بمفاتحة وزارة التخطيط لغرض التحقق من صحة وسلامة موقف الجهات المتعاقد معها من الناحية…Bodies that never asked Planning whether a contractor was barred.
~18 rowsnot yet extracted
TABLE 16
Contracts written outside the standard documentsلم يتم اعداد العقد وفق اجراءات الوثائق القياسية الصادرة من وزارة التخطيط بكتابها المرقم…Ignoring the Planning Ministry’s standard contract forms.
~8 rowsnot yet extracted
TABLE 17
Internal audit never looked at the contractعدم قيام قسم التدقيق الداخلي بتدقيق جميع مراحل العقد وتنفيذه واضبارة العقدContract files never audited internally.
59 rowsverified
TABLE 18
Direct invitation used without justificationاستخدام اسلوب الدعوة المباشرة على الرغم من عدم توفر مبرراتها في التعاقدContracts handed out without competition.
11 rowsverified
TABLE 19
Contracts never certified by the legal departmentعدم مصادقة العقد من قبل الدائرة القانونية في الادارات بصفتها كاتب العدلContracts unratified by the body’s own lawyers.
~8 rowsnot yet extracted
TABLE 20
Tax money never paid to the tax authorityعدم تسديد المبالغ الضريبية الواجب تسديدها الى الهيئة العامة للضرائبSums withheld and not transferred.
~12 rowsnot yet extracted
TABLE 21
Stamp duty not collectedعدم استيفاء رسم الطابع الماليFees the state failed to charge.
~15 rowsnot yet extracted
TABLE 22
Court fees not collectedعدم استيفاء الرسم العدليJudicial fees never taken.
6 rowsverified
TABLE 23
Projects taken back from contractors in 2024المشاريع المسحوبة من المقاولين خلال سنة ٢٠٢٤Work withdrawn mid-contract.
~6 rowsnot yet extracted
TABLE 24
Late-delivery penalties never chargedعدم احتساب الغرامات التأخيريةFines the contract allowed and nobody applied.
12 rowsverified
TABLE 25
Debit and credit balances never confirmedتأييدات الأرصدة المدينة والدائنةBalances no counterparty has verified.
24 rowsverified
TABLE 26
Debit and credit balances frozen and rolled overالأرصدة المدينة والدائنة الموقوفة والمدورةBalances carried year to year with nothing done.
~13 rowsnot yet extracted
TABLE 27
Advances and deposits frozen and rolled overأرصدة السلف والأمانات الموقوفة والمدورةAdvance and deposit balances left sitting.
~22 rowsnot yet extracted
TABLE 28
Balances sitting on the wrong sideالارصدة المدينة والدائنة المخالفة لطبيعتهاDebit balances that should be credit, and the reverse.
10 rowsverified
TABLE 29
Advances and deposits on the wrong sideأرصدة السلف والأمانات المخالفة لطبيعتهاThe same problem in the advances and deposits accounts.
4 rowsverified
TABLE 30
Pension money withheld from staffعدم تسديد مبالغ استقطاعات التقاعد لهيئة التقاعد الوطنيةBodies that deducted pension contributions and never passed them to the National Pension Authority.
31 rowsverified
TABLE 31
Treasury profit shares unpaidعدم تسديد حصة الخزينة العامة من الأرباحState companies owing the treasury its legal share of profits.
~11 rowsnot yet extracted
TABLE 32
State vehicles assigned to outsidersالسيارات والآليات المنسبة للغيرCars and machinery in the hands of people outside the body.
~17 rowsnot yet extracted
TABLE 33
State vehicles lost or stolenالسيارات والآليات المفقودة والمسروقةVehicles recorded as lost or stolen, with the Board’s account of each case.
~9 rowsnot yet extracted
TABLE 34
Encroachment on state propertyالتجاوز على ممتلكات الدولةLand and buildings occupied without right.
~12 rowsnot yet extracted
TABLE 35
Revenue never estimated, or estimated badlyعدم تقدير الإيرادات او عدم دقتهاBodies with no reliable revenue forecast.
4 rowsverified
TABLE 36
Matching entries never madeعدم تنظيم القيود النظامية المتقابلةRequired corresponding book entries missing.
10 rowsverified
TABLE 37
Unification register violationsمخالفات سجل التوحيدBreaches of the consolidated register rules.
~14 rowsnot yet extracted
TABLE 38
Court cases for and against state bodiesالدعاوى المقامة من قبل الدوائر على الغير وبالعكسLitigation counts, department by department.
~13 rowsnot yet extracted

Page numbers are the report’s own printed numbering — the annex restarts at 1. Arabic titles are exactly as the Board printed them; where a table carries no printed title, the English name is the desk’s description of what the table holds. Back to the Ledger