دائرة التدريب وبحوث الطاقة — debit and credit balances frozen and rolled over. Board report 14695.
Ministry of Electricity
وزارة الكهرباءWhat the Board recorded
Verified figures first, with their printed-page receipts. Below them, the sections of the report about this institution that the Audit has not yet extracted — named, so absence is never mistaken for a clean bill.
Ministry diwan — debit and credit balances frozen and rolled over. Board report 9825.
State Co for Electricity Production — ministry headquarters taking their units’ money. Board report 26184 في 2025/10/7.
State Co for Electricity Production deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 9527, 2025/4/13.
Central Electricity Distribution Co deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 26840, 2025/10/14.
Ministry diwan deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 24005, 2025/9/16.
لشركة العامة لتوزيع كهرباء الوسط — tax money never paid to the tax authority. The Board records: لم تقم الشركة بتسديد المبالغ المستقطعة خلال السنة لصالح الهيئة العامة للضرائب Board report 26840.
The same body as the row above (merged in print) — advances and deposits frozen and rolled over. Board report 9825.
Ministry diwan — advances and deposits frozen and rolled over. Board report 9825.
الشركة العامة لانتاج الطاقة الكهربائية/الفرات الاوسط — allocations unused, or exceeded. Board report 7-10-2025-26148-في.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 15554.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 22293.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 2557.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 26512.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 2704.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 31012.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 3753.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 4192.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 4194.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7616.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7781.
The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7921.
State Co for Electricity Production — winning bidders left waiting to sign. Board report 1201.
State Co for Electricity Production — winning bidders left waiting to sign. Board report 21361.
State Co for Electricity Production — winning bidders left waiting to sign. Board report 3952.
State Co for Electricity Production — winning bidders left waiting to sign. Board report 5366.
الشركة العامة لانتاج الطاقة الكهربائية لشركة العامة لانتاج الطاقة الكهربائية — winning bidders left waiting to sign. Board report 26360.
الشركة العامة لتوزيع كهرباء الجنوب — winning bidders left waiting to sign. Board report 31150.
الشركة العامة لتوزيع كهرباء الجنوب — winning bidders left waiting to sign. Board report 7619.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 11520.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 29791.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 3602.
Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 16032.
Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 32461.
Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 32582.
الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 22552.
الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 28058.
الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 32406.
الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 7243.
الشركة العامة لنقل الطاقة الكهربائية — winning bidders left waiting to sign. Board report 15528.
الشركة العامة لنقل الطاقة الكهربائية — winning bidders left waiting to sign. Board report 20972.
The same body as the row above (merged in print) — the blacklist never checked. Board report 27346.
The same body as the row above (merged in print) — the blacklist never checked. Board report 4.
The same body as the row above (merged in print) — the blacklist never checked. Board report 4191.
The same body as the row above (merged in print) — the blacklist never checked. Board report 5.
The same body as the row above (merged in print) — the blacklist never checked. Board report 7499.
The same body as the row above (merged in print) — the blacklist never checked. Board report 7921.
State Co for Electricity Production — the blacklist never checked. Board report 10157.
State Co for Electricity Production — the blacklist never checked. Board report 1201.
State Co for Electricity Production — the blacklist never checked. Board report 2557.
State Co for Electricity Production — the blacklist never checked. Board report 27965.
State Co for Electricity Production — the blacklist never checked. Board report 3952.
State Co for Electricity Production — the blacklist never checked. Board report 4193.
State Co for Electricity Production — the blacklist never checked. Board report 5366.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — the blacklist never checked. Board report 6.
الشركة العامة لتوزيع كهرباء الشمال — the blacklist never checked. Board report 25995.
الشركة العامة لتوزيع كهرباء الفرات الاوسط — the blacklist never checked. Board report 3602.
Central Electricity Distribution Co — the blacklist never checked. Board report 10472.
Central Electricity Distribution Co — the blacklist never checked. Board report 32582.
Central Electricity Distribution Co — the blacklist never checked. Board report 3938.
الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 24427.
الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 28058.
الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 32406.
الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 7243.
الشركة العامة لنقل الطاقة الكهربائية — the blacklist never checked. Board report 15115.
الشركة العامة لنقل الطاقة الكهربائية — the blacklist never checked. Board report 7958.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 10157.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 22552.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5366.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5369.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5574.
The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 9457.
State Co for Electricity Production — ignoring cabinet decision 361 of 2022. Board report 21361.
State Co for Electricity Production — ignoring cabinet decision 361 of 2022. Board report 5575.
Central Electricity Distribution Co — ignoring cabinet decision 361 of 2022. Board report 29778.
الشركة العامة لتوزيع كهرباء بغداد — ignoring cabinet decision 361 of 2022. Board report 8105.
الشركة العامة لنقل الطاقة الكهربائية — ignoring cabinet decision 361 of 2022. Board report 11565.
الشركة العامة لنقل الطاقة الكهربائية — ignoring cabinet decision 361 of 2022. Board report 7499.
الشركة العامة لتوزيع كهرباء الجنوب — contracts written outside the standard documents. Board report 7619.
Central Electricity Distribution Co — contracts written outside the standard documents. Board report 661.
The same body as the row above (merged in print) — contracts barely progressing. Board report 15528.
The same body as the row above (merged in print) — contracts barely progressing. Board report 15554.
The same body as the row above (merged in print) — contracts barely progressing. Board report 26512.
The same body as the row above (merged in print) — contracts barely progressing. Board report 31012.
The same body as the row above (merged in print) — contracts barely progressing. Board report 32582.
The same body as the row above (merged in print) — contracts barely progressing. Board report 6943.
The same body as the row above (merged in print) — contracts barely progressing. Board report 7781.
State Co for Electricity Production — contracts barely progressing. Board report 12217.
State Co for Electricity Production — contracts barely progressing. Board report 16036.
State Co for Electricity Production — contracts barely progressing. Board report 18931.
State Co for Electricity Production — contracts barely progressing. Board report 22293.
State Co for Electricity Production — contracts barely progressing. Board report 26360.
State Co for Electricity Production — contracts barely progressing. Board report 4191.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — contracts barely progressing. Board report 5.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 11520.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 12205.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 17055.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 29791.
Central Electricity Distribution Co — contracts barely progressing. Board report 29778.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 11565.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 15115.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 19551.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 20972.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 3584.
الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 7499.
The same body as the row above (merged in print) — estimated costs neither accurate nor updated. Board report 27346.
State Co for Electricity Production — estimated costs neither accurate nor updated. Board report 27965.
State Co for Electricity Production — estimated costs neither accurate nor updated. Board report 7781.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — estimated costs neither accurate nor updated. Board report 11520.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — estimated costs neither accurate nor updated. Board report 3753.
الشركة العامة لنقل الطاقة الكهربائية — estimated costs neither accurate nor updated. Board report 22081.
الشركة العامة لنقل الطاقة الكهربائية — estimated costs neither accurate nor updated. Board report 630.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 4191.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5366.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5369.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5574.
The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 7781.
State Co for Electricity Production — guarantee letters that expire too early. Board report 1201.
State Co for Electricity Production — guarantee letters that expire too early. Board report 2557.
State Co for Electricity Production — guarantee letters that expire too early. Board report 4194.
State Co for Electricity Production — guarantee letters that expire too early. Board report 5575.
State Co for Electricity Production — guarantee letters that expire too early. Board report 7921.
State Co for Electricity Production — guarantee letters that expire too early. Board report 9457.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — guarantee letters that expire too early. Board report 4.
الشركة العامة لتوزيع كهرباء الجنوب — guarantee letters that expire too early. Board report 11394.
الشركة العامة لتوزيع كهرباء الجنوب — guarantee letters that expire too early. Board report 7619.
Central Electricity Distribution Co — guarantee letters that expire too early. Board report 32582.
Central Electricity Distribution Co — guarantee letters that expire too early. Board report 3938.
الشركة العامة لنقل الطاقة الكهربائية /المنطقة الوسطى — guarantee letters that expire too early. Board report 16615.
الشركة العامة لنقل الطاقة الكهربائية — guarantee letters that expire too early. Board report 4133 خارج تقارير.
الشركة العامة لنقل الطاقة الكهربائية — guarantee letters that expire too early. Board report 7499.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 16032.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 1771.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 22293.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 29778.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 32407.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 32582.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4191.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4192.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4193.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 5369.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 5574.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 7921.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 7958.
The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 9457.
State Co for Electricity Production — internal audit never looked at the contract. Board report 10157.
State Co for Electricity Production — internal audit never looked at the contract. Board report 1201.
State Co for Electricity Production — internal audit never looked at the contract. Board report 21361.
State Co for Electricity Production — internal audit never looked at the contract. Board report 2557.
State Co for Electricity Production — internal audit never looked at the contract. Board report 27375.
State Co for Electricity Production — internal audit never looked at the contract. Board report 4194.
State Co for Electricity Production — internal audit never looked at the contract. Board report 5366.
State Co for Electricity Production — internal audit never looked at the contract. Board report 5575.
State Co for Electricity Production — internal audit never looked at the contract. Board report 7616.
State Co for Electricity Production — internal audit never looked at the contract. Board report 7781.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — internal audit never looked at the contract. Board report 5.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — internal audit never looked at the contract. Board report 6.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 10472.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 16288.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 32461.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 3431.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 3938.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 661.
Central Electricity Distribution Co — internal audit never looked at the contract. Board report 6816.
الشركة العامة لتوزيع كهرباء بغداد — internal audit never looked at the contract. Board report 24427.
الشركة العامة لتوزيع كهرباء بغداد — internal audit never looked at the contract. Board report 28058.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 11565.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 22081.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 3584.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 630.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 6943.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 7499.
الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 7919.
Dhi Qar Oil Co — internal audit never looked at the contract. Board report 7782.
The same body as the row above (merged in print) — late-delivery penalties never charged. Board report 31012.
The same body as the row above (merged in print) — late-delivery penalties never charged. Board report 31150.
State Co for Electricity Production — late-delivery penalties never charged. Board report 26360.
الشركة العامة لتوزيع كهرباء الجنوب — late-delivery penalties never charged. Board report 23674.
الشركة العامة لتوزيع كهرباء الجنوب — late-delivery penalties never charged. Board report 31150.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — late-delivery penalties never charged. Board report 29791.
Central Electricity Distribution Co — late-delivery penalties never charged. Board report 29778.
State Co for Electricity Production — contractors with no comparable work. Board report 10157.
State Co for Electricity Production — contractors with no comparable work. Board report 22293.
State Co for Electricity Production — contractors with no comparable work. Board report 7921.
State Co for Electricity Production — contractors with no comparable work. Board report 9457.
الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — contractors with no comparable work. Board report 6.
الشركة العامة لتوزيع كهرباء الجنوب — contractors with no comparable work. Board report 6366 خارج تقارير.
الشركة العامة لتوزيع كهرباء الفرات الأوسط — contractors with no comparable work. Board report 11342.
الشركة العامة لنقل الطاقة الكهربائية — contractors with no comparable work. Board report 14488.
الشركة العامة لنقل الطاقة الكهربائية — contractors with no comparable work. Board report 6943.
The same body as the row above (merged in print) — no certificates of origin. Board report 28058.
The same body as the row above (merged in print) — no certificates of origin. Board report 9829.
State Co for Electricity Production — no certificates of origin. Board report 22293.
State Co for Electricity Production — no certificates of origin. Board report 4193.
الشركة العامة لتوزيع كهرباء الجنوب — no certificates of origin. Board report 31150.
الشركة العامة لتوزيع كهرباء بغداد — no certificates of origin. Board report 24427.
الشركة العامة لنقل الطاقة الكهربائية — no certificates of origin. Board report 15115.
State Co for Electricity Production — encroachment on state property. The Board records: وجود عدد من العقارات التابعة للشركة متجاوز عليها من قبل الغير وقد تم رفع دعوي بحق المتجاوزين من قبل الشركة Board report 19548.
الشركة العامة لتوزيع كهرباء الجنوب — encroachment on state property. The Board records: استمرار التجاوز علي 7 عقارات عائدة للشركة Board report 21868.
الشركة العامة لتوزيع كهرباء الجنوب — revenue never estimated, or estimated badly. Board report 21868.
دائرة التشغيل والتحكم — revenue never estimated, or estimated badly. Board report 23775.
Ministry diwan — revenue never estimated, or estimated badly. Board report 9825.
الشركة العامة لتوزيع كهرباء الجنوب — state vehicles assigned to outsiders. Board report 14505.
Performance audit — Chapter 5, printed pages 145–146.
Compliance findings — Chapter 6, printed pages 232–253 — 22 pages on this institution alone.
Every verified sentence above is arithmetic over figures transcribed twice and reconciled against the report’s printed totals. English names are the desk’s renderings; the Board’s Arabic is authoritative. Audit observations are the Board’s recorded findings, not convictions, and name institutions, never individuals. All institutions · The Audit