SHAFAQShafaq News..Four-year-old dies after rescue from Nineveh well2HSHAFAQShafaq News..KRI to hold Peshmerga unification ceremony Monday2HSHAFAQShafaq News..New push to expand Iraq-Syria border transport2HSHAFAQShafaq News..Iran repatriates 159 nationals from Iraqi prisons4HINAParliamentarians and Politicians: Al-Zaidi’s UN Participation Boosts Iraq’s International Presence and Investment Prospects » Iraqi News Agency4HSHAFAQShafaq News..Rescuers race to save toddler from Nineveh well4HKURDISTAN24KRG Council of Ministers Tasks Ministries for Federal Loans4H964 MEDIASadr welcomes the American withdrawal and warns against what may follow it5HSHAFAQShafaq News..Al-Sadr: US withdrawal to end dictatorship, occupation5HSHAFAQ'Sovereignty Law' gains traction within Iraq's CF5HRUDAWIraq’s Basra maintains 2.9 million bpd amid Hormuz disruptions, OPEC+ cuts6HSHAFAQShafaq News..Iraqi journalist sentenced in Al-Maliki defamation case6HSHAFAQShafaq News..Iraq may cut unsubsidized fuel prices within days6HRUDAWIraq, Kuwait seize 700k Captagon pills in joint operation7HSHAFAQShafaq News..Erbil explosions linked to drills, security activity7HTHE NEW REGIONErbil blasts caused by military training, pose no danger: Kurdish counterterrorism7H
Iraq Monitorعين على العراقPrimary-source intelligence
Ministry · audited FY2025

Ministry of Electricity

وزارة الكهرباء
Verified figures205
Pages in the report24
Report sections2

What the Board recorded

Verified figures first, with their printed-page receipts. Below them, the sections of the report about this institution that the Audit has not yet extracted — named, so absence is never mistaken for a clean bill.

IQD 1.7bn (~$1m)

دائرة التدريب وبحوث الطاقة — debit and credit balances frozen and rolled over. Board report 14695.

ANNEX · P. 63
IQD 1.7bn (~$1m)

Ministry diwan — debit and credit balances frozen and rolled over. Board report 9825.

ANNEX · P. 63
IQD 186m (~$143,077)

State Co for Electricity Production — ministry headquarters taking their units’ money. Board report 26184 في 2025/10/7.

ANNEX · P. 39
IQD 2m (~$1,538)

State Co for Electricity Production deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 9527, 2025/4/13.

ANNEX TABLE 30 · P. 68
IQD 371m (~$285,385)

Central Electricity Distribution Co deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 26840, 2025/10/14.

ANNEX TABLE 30 · P. 68
IQD 12m (~$9,231)

Ministry diwan deducted pension contributions from staff salaries and never passed them to the National Pension Authority. Board report 24005, 2025/9/16.

ANNEX TABLE 30 · P. 68
IQD 16.0bn (~$12m)

لشركة العامة لتوزيع كهرباء الوسط — tax money never paid to the tax authority. The Board records: لم تقم الشركة بتسديد المبالغ المستقطعة خلال السنة لصالح الهيئة العامة للضرائب Board report 26840.

ANNEX · P. 53
Recorded

The same body as the row above (merged in print) — advances and deposits frozen and rolled over. Board report 9825.

ANNEX · P. 66
Recorded

Ministry diwan — advances and deposits frozen and rolled over. Board report 9825.

ANNEX · P. 66
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/الفرات الاوسط — allocations unused, or exceeded. Board report 7-10-2025-26148-في.

ANNEX · P. 38
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 15554.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 22293.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 2557.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 26512.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 2704.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 31012.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 3753.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 4192.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 4194.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7616.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7781.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — winning bidders left waiting to sign. Board report 7921.

ANNEX · P. 42
Recorded

State Co for Electricity Production — winning bidders left waiting to sign. Board report 1201.

ANNEX · P. 42
Recorded

State Co for Electricity Production — winning bidders left waiting to sign. Board report 21361.

ANNEX · P. 42
Recorded

State Co for Electricity Production — winning bidders left waiting to sign. Board report 3952.

ANNEX · P. 42
Recorded

State Co for Electricity Production — winning bidders left waiting to sign. Board report 5366.

ANNEX · P. 42
Recorded

الشركة العامة لانتاج الطاقة الكهربائية لشركة العامة لانتاج الطاقة الكهربائية — winning bidders left waiting to sign. Board report 26360.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — winning bidders left waiting to sign. Board report 31150.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — winning bidders left waiting to sign. Board report 7619.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 11520.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 29791.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — winning bidders left waiting to sign. Board report 3602.

ANNEX · P. 42
Recorded

Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 16032.

ANNEX · P. 42
Recorded

Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 32461.

ANNEX · P. 42
Recorded

Central Electricity Distribution Co — winning bidders left waiting to sign. Board report 32582.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 22552.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 28058.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 32406.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء بغداد — winning bidders left waiting to sign. Board report 7243.

ANNEX · P. 42
Recorded

الشركة العامة لنقل الطاقة الكهربائية — winning bidders left waiting to sign. Board report 15528.

ANNEX · P. 42
Recorded

الشركة العامة لنقل الطاقة الكهربائية — winning bidders left waiting to sign. Board report 20972.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 27346.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 4.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 4191.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 5.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 7499.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — the blacklist never checked. Board report 7921.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 10157.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 1201.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 2557.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 27965.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 3952.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 4193.

ANNEX · P. 48
Recorded

State Co for Electricity Production — the blacklist never checked. Board report 5366.

ANNEX · P. 48
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — the blacklist never checked. Board report 6.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء الشمال — the blacklist never checked. Board report 25995.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء الفرات الاوسط — the blacklist never checked. Board report 3602.

ANNEX · P. 48
Recorded

Central Electricity Distribution Co — the blacklist never checked. Board report 10472.

ANNEX · P. 48
Recorded

Central Electricity Distribution Co — the blacklist never checked. Board report 32582.

ANNEX · P. 48
Recorded

Central Electricity Distribution Co — the blacklist never checked. Board report 3938.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 24427.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 28058.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 32406.

ANNEX · P. 48
Recorded

الشركة العامة لتوزيع كهرباء بغداد — the blacklist never checked. Board report 7243.

ANNEX · P. 48
Recorded

الشركة العامة لنقل الطاقة الكهربائية — the blacklist never checked. Board report 15115.

ANNEX · P. 48
Recorded

الشركة العامة لنقل الطاقة الكهربائية — the blacklist never checked. Board report 7958.

ANNEX · P. 48
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 10157.

ANNEX · P. 40
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 22552.

ANNEX · P. 40
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5366.

ANNEX · P. 40
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5369.

ANNEX · P. 40
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 5574.

ANNEX · P. 40
Recorded

The same body as the row above (merged in print) — ignoring cabinet decision 361 of 2022. Board report 9457.

ANNEX · P. 40
Recorded

State Co for Electricity Production — ignoring cabinet decision 361 of 2022. Board report 21361.

ANNEX · P. 40
Recorded

State Co for Electricity Production — ignoring cabinet decision 361 of 2022. Board report 5575.

ANNEX · P. 40
Recorded

Central Electricity Distribution Co — ignoring cabinet decision 361 of 2022. Board report 29778.

ANNEX · P. 40
Recorded

الشركة العامة لتوزيع كهرباء بغداد — ignoring cabinet decision 361 of 2022. Board report 8105.

ANNEX · P. 40
Recorded

الشركة العامة لنقل الطاقة الكهربائية — ignoring cabinet decision 361 of 2022. Board report 11565.

ANNEX · P. 40
Recorded

الشركة العامة لنقل الطاقة الكهربائية — ignoring cabinet decision 361 of 2022. Board report 7499.

ANNEX · P. 40
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — contracts written outside the standard documents. Board report 7619.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — contracts written outside the standard documents. Board report 661.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 15528.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 15554.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 26512.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 31012.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 32582.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 6943.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — contracts barely progressing. Board report 7781.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 12217.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 16036.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 18931.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 22293.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 26360.

ANNEX · P. 47
Recorded

State Co for Electricity Production — contracts barely progressing. Board report 4191.

ANNEX · P. 47
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — contracts barely progressing. Board report 5.

ANNEX · P. 47
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 11520.

ANNEX · P. 47
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 12205.

ANNEX · P. 47
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 17055.

ANNEX · P. 47
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — contracts barely progressing. Board report 29791.

ANNEX · P. 47
Recorded

Central Electricity Distribution Co — contracts barely progressing. Board report 29778.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 11565.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 15115.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 19551.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 20972.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 3584.

ANNEX · P. 47
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contracts barely progressing. Board report 7499.

ANNEX · P. 47
Recorded

The same body as the row above (merged in print) — estimated costs neither accurate nor updated. Board report 27346.

ANNEX · P. 41
Recorded

State Co for Electricity Production — estimated costs neither accurate nor updated. Board report 27965.

ANNEX · P. 41
Recorded

State Co for Electricity Production — estimated costs neither accurate nor updated. Board report 7781.

ANNEX · P. 41
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — estimated costs neither accurate nor updated. Board report 11520.

ANNEX · P. 41
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — estimated costs neither accurate nor updated. Board report 3753.

ANNEX · P. 41
Recorded

الشركة العامة لنقل الطاقة الكهربائية — estimated costs neither accurate nor updated. Board report 22081.

ANNEX · P. 41
Recorded

الشركة العامة لنقل الطاقة الكهربائية — estimated costs neither accurate nor updated. Board report 630.

ANNEX · P. 41
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 4191.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5366.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5369.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 5574.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — guarantee letters that expire too early. Board report 7781.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 1201.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 2557.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 4194.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 5575.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 7921.

ANNEX · P. 44
Recorded

State Co for Electricity Production — guarantee letters that expire too early. Board report 9457.

ANNEX · P. 44
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — guarantee letters that expire too early. Board report 4.

ANNEX · P. 44
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — guarantee letters that expire too early. Board report 11394.

ANNEX · P. 44
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — guarantee letters that expire too early. Board report 7619.

ANNEX · P. 44
Recorded

Central Electricity Distribution Co — guarantee letters that expire too early. Board report 32582.

ANNEX · P. 44
Recorded

Central Electricity Distribution Co — guarantee letters that expire too early. Board report 3938.

ANNEX · P. 44
Recorded

الشركة العامة لنقل الطاقة الكهربائية /المنطقة الوسطى — guarantee letters that expire too early. Board report 16615.

ANNEX · P. 44
Recorded

الشركة العامة لنقل الطاقة الكهربائية — guarantee letters that expire too early. Board report 4133 خارج تقارير.

ANNEX · P. 44
Recorded

الشركة العامة لنقل الطاقة الكهربائية — guarantee letters that expire too early. Board report 7499.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 16032.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 1771.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 22293.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 29778.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 32407.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 32582.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4191.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4192.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 4193.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 5369.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 5574.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 7921.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 7958.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — internal audit never looked at the contract. Board report 9457.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 10157.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 1201.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 21361.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 2557.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 27375.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 4194.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 5366.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 5575.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 7616.

ANNEX · P. 50
Recorded

State Co for Electricity Production — internal audit never looked at the contract. Board report 7781.

ANNEX · P. 50
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — internal audit never looked at the contract. Board report 5.

ANNEX · P. 50
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — internal audit never looked at the contract. Board report 6.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 10472.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 16288.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 32461.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 3431.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 3938.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 661.

ANNEX · P. 50
Recorded

Central Electricity Distribution Co — internal audit never looked at the contract. Board report 6816.

ANNEX · P. 50
Recorded

الشركة العامة لتوزيع كهرباء بغداد — internal audit never looked at the contract. Board report 24427.

ANNEX · P. 50
Recorded

الشركة العامة لتوزيع كهرباء بغداد — internal audit never looked at the contract. Board report 28058.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 11565.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 22081.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 3584.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 630.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 6943.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 7499.

ANNEX · P. 50
Recorded

الشركة العامة لنقل الطاقة الكهربائية — internal audit never looked at the contract. Board report 7919.

ANNEX · P. 50
Recorded

Dhi Qar Oil Co — internal audit never looked at the contract. Board report 7782.

ANNEX · P. 50
Recorded

The same body as the row above (merged in print) — late-delivery penalties never charged. Board report 31012.

ANNEX · P. 61
Recorded

The same body as the row above (merged in print) — late-delivery penalties never charged. Board report 31150.

ANNEX · P. 61
Recorded

State Co for Electricity Production — late-delivery penalties never charged. Board report 26360.

ANNEX · P. 61
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — late-delivery penalties never charged. Board report 23674.

ANNEX · P. 61
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — late-delivery penalties never charged. Board report 31150.

ANNEX · P. 61
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — late-delivery penalties never charged. Board report 29791.

ANNEX · P. 61
Recorded

Central Electricity Distribution Co — late-delivery penalties never charged. Board report 29778.

ANNEX · P. 61
Recorded

State Co for Electricity Production — contractors with no comparable work. Board report 10157.

ANNEX · P. 44
Recorded

State Co for Electricity Production — contractors with no comparable work. Board report 22293.

ANNEX · P. 44
Recorded

State Co for Electricity Production — contractors with no comparable work. Board report 7921.

ANNEX · P. 44
Recorded

State Co for Electricity Production — contractors with no comparable work. Board report 9457.

ANNEX · P. 44
Recorded

الشركة العامة لانتاج الطاقة الكهربائية/المنطقة الجنوبية — contractors with no comparable work. Board report 6.

ANNEX · P. 44
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — contractors with no comparable work. Board report 6366 خارج تقارير.

ANNEX · P. 44
Recorded

الشركة العامة لتوزيع كهرباء الفرات الأوسط — contractors with no comparable work. Board report 11342.

ANNEX · P. 44
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contractors with no comparable work. Board report 14488.

ANNEX · P. 44
Recorded

الشركة العامة لنقل الطاقة الكهربائية — contractors with no comparable work. Board report 6943.

ANNEX · P. 44
Recorded

The same body as the row above (merged in print) — no certificates of origin. Board report 28058.

ANNEX · P. 42
Recorded

The same body as the row above (merged in print) — no certificates of origin. Board report 9829.

ANNEX · P. 42
Recorded

State Co for Electricity Production — no certificates of origin. Board report 22293.

ANNEX · P. 42
Recorded

State Co for Electricity Production — no certificates of origin. Board report 4193.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — no certificates of origin. Board report 31150.

ANNEX · P. 42
Recorded

الشركة العامة لتوزيع كهرباء بغداد — no certificates of origin. Board report 24427.

ANNEX · P. 42
Recorded

الشركة العامة لنقل الطاقة الكهربائية — no certificates of origin. Board report 15115.

ANNEX · P. 42
4

State Co for Electricity Production — encroachment on state property. The Board records: وجود عدد من العقارات التابعة للشركة متجاوز عليها من قبل الغير وقد تم رفع دعوي بحق المتجاوزين من قبل الشركة Board report 19548.

ANNEX · P. 72
7

الشركة العامة لتوزيع كهرباء الجنوب — encroachment on state property. The Board records: استمرار التجاوز علي 7 عقارات عائدة للشركة Board report 21868.

ANNEX · P. 72
Recorded

الشركة العامة لتوزيع كهرباء الجنوب — revenue never estimated, or estimated badly. Board report 21868.

ANNEX · P. 74
Recorded

دائرة التشغيل والتحكم — revenue never estimated, or estimated badly. Board report 23775.

ANNEX · P. 74
Recorded

Ministry diwan — revenue never estimated, or estimated badly. Board report 9825.

ANNEX · P. 74
3

الشركة العامة لتوزيع كهرباء الجنوب — state vehicles assigned to outsiders. Board report 14505.

ANNEX · P. 70
In the report, not yet verified

Performance audit — Chapter 5, printed pages 145–146.

PP. 145146
In the report, not yet verified

Compliance findings — Chapter 6, printed pages 232–253 — 22 pages on this institution alone.

PP. 232253

Every verified sentence above is arithmetic over figures transcribed twice and reconciled against the report’s printed totals. English names are the desk’s renderings; the Board’s Arabic is authoritative. Audit observations are the Board’s recorded findings, not convictions, and name institutions, never individuals. All institutions · The Audit