Project cost, liquidity, and completion period FY2025
The table shows the project, its estimated cost, the required and advertised financial liquidity, and the announced completion period compared with one third of that period. Figures in IQD thousands. First extraction failed verification; the configuration was corrected and the table re-verified against the printed page — the failed attempt stays on record.
Under review — 1 cell carries two readings. Every figure in this table was transcribed twice, independently, from the printed page. Where the two transcriptions agree, the figure is published as verified. Where they disagree, BOTH readings are shown under a “two readings” mark — neither is presented as fact — until a human re-reads the printed page and settles it. Rows the two transcriptions could not match are withheld entirely. Disagreement is disclosed, never resolved by a model.
| Project | Estimated cost (thousands) | Required liquidity per formula above | Financial liquidity per announcement | Duration specified in announcement (days) | One-third of duration (days) |
|---|---|---|---|---|---|
هدم وانشاء متوسطة الامام الحسين (ع) للبنين بسعة 18 صف نموذجية في قضاء السماوة/الغربي | TWO READINGS2,577,22225,772,222 | 257,722,200 | 116,000,000 | 600 | 200 |
FEDERAL BOARD OF SUPREME AUDIT · ANNUAL REPORT 2025 · PRINTED PAGE 584 · UNIT IQD k · CSV ↓
- Project
- Estimated cost (thousands)
- Required liquidity per formula above
- Financial liquidity per announcement
- Duration specified in announcement (days)
- One-third of duration (days)
Transcribed in two independent passes, cell-compared, reconciled against the printed total on page 584; a mismatch would have kept this table off the site. English names are the desk’s renderings; the Arabic is the Board’s own text and the authoritative version. Dollars at the official 1,300 IQD/USD budget rate, context only. Download the CSV · All tables