Project cost, cash flow, and duration FY2025
The table shows the project name, estimated cost, required and available cash, and the advertised project duration compared with one-third of that duration. Figures in IQD thousands. First extraction failed verification; the configuration was corrected and the table re-verified against the printed page — the failed attempt stays on record.
Under review — 1 cell carries two readings. Every figure in this table was transcribed twice, independently, from the printed page. Where the two transcriptions agree, the figure is published as verified. Where they disagree, BOTH readings are shown under a “two readings” mark — neither is presented as fact — until a human re-reads the printed page and settles it. Rows the two transcriptions could not match are withheld entirely. Disagreement is disclosed, never resolved by a model.
| Project | Estimated cost (IQD thousands) | Required liquidity per formula (IQD thousands) | Financial liquidity per announcement (IQD thousands) | Duration specified in announcement (days) | One-third of duration (days) |
|---|---|---|---|---|---|
انشاء محطة الرحاب الثانوية 33/11 سعة (2*31,5) م.ف.ا مع استحداث مغذي 33 ك ف مزدوج في السلمان | TWO READINGS8,155,697815,697 | 13,592,828 | 941,045 | 390 | 130 |
FEDERAL BOARD OF SUPREME AUDIT · ANNUAL REPORT 2025 · PRINTED PAGE 585 · UNIT IQD k · CSV ↓
- Project
- Estimated cost (IQD thousands)
- Required liquidity per formula (IQD thousands)
- Financial liquidity per announcement (IQD thousands)
- Duration specified in announcement (days)
- One-third of duration (days)
Transcribed in two independent passes, cell-compared, reconciled against the printed total on page 585; a mismatch would have kept this table off the site. English names are the desk’s renderings; the Arabic is the Board’s own text and the authoritative version. Dollars at the official 1,300 IQD/USD budget rate, context only. Download the CSV · All tables