Contracts and implementation status FY2025
The table lists two contracts, their dates and durations, contract amounts, planned and actual completion rates, variances, and the agency’s follow-up actions. Figures in IQD millions.
Under review — 1 cell carries two readings. Every figure in this table was transcribed twice, independently, from the printed page. Where the two transcriptions agree, the figure is published as verified. Where they disagree, BOTH readings are shown under a “two readings” mark — neither is presented as fact — until a human re-reads the printed page and settles it. Rows the two transcriptions could not match are withheld entirely. Disagreement is disclosed, never resolved by a model.
| Column 1 | Contract no. & date | Contract duration (days) | Column 4 | Planned physical progress as of 2024/12/5 (%) | Actual physical progress as of 2024/12/5 (%) | Deviation rate (%) | Agency actions on investment project status (as of 2024/12/5) |
|---|---|---|---|---|---|---|---|
مشروع ربط الناصرية بالطريق السريع رقم (1) بطول 24,6 كم | TWO READINGS5-11-30-2023-2023-في3-5-11-30-2023-2023-في | 900 | 80,049 | 53 | 85 | 42 | تم توجيه كتاب من الامانة العامة لمجلس الوزراء/مكتب الامين العام لمجلس الوزراء لغرض توجيه الجهات ذات العلاقة لحل المشاكل والمعوقات التي تخص المشروع وتم مفاتحة وزارة الاعمار والاسكان والبلديات والاشغال العامة/مكتب الوزير لغرض مفاتحة القائد العام للقوات المسلحة بموجب الكتاب المرقم (م/518) في 2024/8/11 للايعاز الي الجهات الامنية بايقاف مدة التجاوزات واتخاذ الاجراءات القانونية . |
FEDERAL BOARD OF SUPREME AUDIT · ANNUAL REPORT 2025 · PRINTED PAGE 460 · UNIT IQD mn · CSV ↓
- Column 1
- Contract no. & date
- Contract duration (days)
- Column 4
- Planned physical progress as of 2024/12/5 (%)
- Actual physical progress as of 2024/12/5 (%)
- Deviation rate (%)
- Agency actions on investment project status (as of 2024/12/5)
Transcribed in two independent passes, cell-compared, reconciled against the printed total on page 460; a mismatch would have kept this table off the site. English names are the desk’s renderings; the Arabic is the Board’s own text and the authoritative version. Dollars at the official 1,300 IQD/USD budget rate, context only. Download the CSV · All tables